Not a whole lot happening at the Wallagio the past few days.  But that all changed today.

_MG_1328

The opening to the bathroom/closets from my bedroom has been closed.  Also, a window area has been sectioned out.

_MG_1329

More drywall removed.

_MG_1330

A trench was dug in my garage looking for the sewer line.

_MG_1331

More jackhammering.

_MG_1332

There’s now a doorway from the kitchen into the master bathroom.

_MG_1333

The closed passageway from the master bathroom into the old master bedroom.

_MG_1334

A torn up master bathroom.