My personal laptop got packed away while, so I have been unable to process pictures.  But I have been taking them throughout.  Rather than dump a bunch of pics, I’ll list them out by day and what happened that day.

Sept 8

_MG_1953

_MG_1954

Baseboards installed.

_MG_1955

Oven installed.  The kitchen is now fully functional.

_MG_1956

Barstools!

 

Sept 9

_MG_1957

More progress on my new bedroom.

_MG_1959

Spare bath getting demoed.

_MG_1961

_MG_1962

Zoe loves the new floors.

_MG_1963

Even more progress with the new bedroom.

_MG_1966

Spare bedrooms floors ripped up.

_MG_1968

More progress on spare bath.

Sept 11

_MG_1973

Bedroom is practically ready for me to move in.

Sept 13

_MG_1975

Backsplash, floor tile and cabinet hardware installed.

Sept 14

_MG_1979

Tile in the spare bath finished.

_MG_1980

Bedroom finished and being lived in.